Renovations day 1

Day 1. The fun part. Ripping out all the old and damp and decaying kitchens and cupboards. Stripping off all curtain rails, wiring, nails and tiles. Breaking through all the old dry walling that used to separate all the areas for all the different tenants. Cleaning up the overgrown garden and removing uneeded greenery.

The kitchen has major damp problems from leaking shower pipes in the walls. We will do a separate post on dealing with damp issues.

IMG_7678  IMG_7688     IMG_7724 IMG_7725  IMG_7737  IMG_7745 IMG_7694 IMG_7730 IMG_7702IMG_7684 IMG_7739

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s